Promoter Details (Other Than Individual)
East Avenue Infracon Pvt. Ltd. Private Limited Company
Main Objects of Organization To develop & deliver quality housing and commercial properties.
Registered Address of Organization Showoom No. 1-2, Nirwana Greens-2 , Khanpur, Kharar
Sahibzada Ajit Singh Nagar (Mohali) , Punjab - 140301
Official Address Showoom No. 1-2, Nirwana Greens-2 , Khanpur, Kharar
Sahibzada Ajit Singh Nagar (Mohali) , Punjab - 140301
3 (in years) 0 (in years)
WebLink (Promoter/Parent-Entity) Not Available
Organization Member Details (If Applicable)
Sr.No Designation Name of Member Official Address View Photograph
1 Director Sumit Goyal House No. 550 , Sector 16
Panchkula , Haryana - 134108
Email: sumitgoyal_chd[at]yahoo.co.in
2 Director Suresh Goyal House No. 550 , Sector 16
Panchkula , Haryana - 134108
Email: sumitgoyal_chd[at]yahoo.co.in
Details and Profile of On-Going and Completed Projects in Past Five Years or since Inception
Sr.No Project Name Project Status Area Constructed (in Sqr mtr) Project Start Date Original Proposed Date of Complete Actual Complete Date
1 Nature Huts 3 Complete 7931.83 25-Jan-2017 31-Dec-2018 31-Dec-2018
Litigation(s) related to Past Projects
Sr.No Project Name Case Title Case Number Authority/Forum Name where case is Pending/Resolved
-- -- -- -- --

About the Project
Project Name Nirwana Heights
Project Address Khanpur, Kharar , Kharar-Kurali Highway (NH205)
Kharar , Sahibzada Ajit Singh Nagar (Mohali) , Punjab - 140301
Project Amenities Lifts Fire Fighting System Green Parks Surface Parking Security Gate CCTV Cameras Water Supply Sewerage Connection Clubhouse Kids Play Area
Project Zone Zone 1 - Master Plan Area of S.A.S. Nagar, New Chandigarh and Zirakpur.
Type of Project (1) Commercial (Building/Tower Development)
(2) Residential (Building/Tower Development)
Project Status New Project Project Cost (in rupees) 860336054.00 (INR)
Project Start Date 05-Mar-2021 Proposed/ Expected Date of Project Completion as specified in Form B 15-Oct-2025
Project Web Link www.visionindiagroup.com Mega Project (Yes/No) No
Specification Details of Proposed Project as per the Brochure/ Prospectus :- RCC Frame Structure
:- Vitrified Tile
:- Paint
:- Branded Bath Fittings
:- Branded Wires and Cables
:- Modular Kitchen
Authorized Person for Communication with regards to Project Sumit Goyal
Khanpur, Kharar , Kharar-Kurali Highway (NH205)
Sahibzada Ajit Singh Nagar (Mohali) , Punjab - 140301
E-Mail: sumitgoyal_chd[at]yahoo.co.in Mobile Phone: 9855540000
Bank Account Details of the Special/Separate Account to be maintained in a Schedule Bank
Bank Name State Bank of India Branch Name Sector 8 C, Chandigarh
Bank Account Number 43736487758 Bank IFSC Code SBIN0011705
Account Holder Name East Avenue Infracon Pvt Ltd
Bank Address SCO103-107, Sector 8 C, , Madhya Marg, Chandigarh
Chandigarh , Chandigarh - 160008
Project Land Details
26054.5 (in sqr mtrs)
15091.4 (in sqr mtrs) 10963.1 (in sqr mtrs)
7807.47 (in sqr mtrs) 0 (in sqr mtrs)
607.87 (in sqr mtrs) 0 (in sqr mtrs)
17179.25 (in sqr mtrs)
Project Land Khasra(s) and Area Details
SrNo Khasra Number of Land proposed to be developed Area of Land proposed under Khasra Name of Villages under Khasra Project Land Status
1 400,401,402,403,2055/405,404 15091.4 (in sqr mtrs) Khanpur Owned By Promoter
2 407,408,1354/406,1355/406 12140.5 (in sqr mtrs) Khanpur Not Owned By Promoter

Project Plan(s)
Sr.No Document Name Reference Number Issue Date View PDF
1 Approved Layout Plan -- --
2 Approved Project Site OR Location Map -- --
3 Sanctioned Building Plan -- --
4 Sanctioned Building Plan -- --
5 Sanctioned Building Plan -- --
6 Sanctioned Building Plan -- --
7 Sanctioned Building Plan -- --
8 Sanctioned Building Plan -- --
9 Sanctioned Building Plan -- --
10 Sanctioned Building Plan -- --
11 Sanctioned Building Plan -- --
12 Sanctioned Building Plan -- --
13 Sanctioned Building Plan -- --
14 Sanctioned Building Plan -- --
15 Sanctioned Building Plan -- --
16 Sanctioned Building Plan -- --
17 Sanctioned Building Plan -- --
18 Sanctioned Building Plan -- --
19 Sanctioned Building Plan -- --
20 Sanctioned Building Plan -- --
Proforma of documents to be signed with Allottees
Sr.No Document Name Reference Number Issue Date View PDF
1 Pro forma Agreement of Sale to be signed with allottees -- --
2 Pro forma of Allotment Letter to be provided to allottees -- --
3 Pro forma of Conveyance Deed to be signed with allottees -- --
4 Pro forma of Conveyance Deed to be signed with allottees -- --
Project Documents
Sr.No Document Name Reference Number Issue Date View PDF
1 Authenticated Copy of Form B -- --
2 CA Certificate (Form 3) -- --
3 CA Certificate (Form 3) -- --
Project Approvals Document(s)
Sr.No Document Name Reference Number Issue Date View PDF
1 Building Permit Issue from Municipal Authority Approvals (Received) 21-Sep-2020
2 CLU Certificate -- --
3 Copy of Registration as Promoter -- --
4 License as Promoter from competent Authority Approvals (Received) 20-Mar-2017
5 License to develop colony or society from Competent Authority -- --
6 License to develop colony or society from Competent Authority -- --
7 License to develop colony or society from Competent Authority -- --
8 License to develop colony or society from Competent Authority -- --
9 NOC from Fire Department/ Chief Fire Officer Approvals (Received) 23-Sep-2020
Project Land Documents
Sr.No Document Name Reference Number Issue Date View PDF
1 Collaboration or Joint Development Agreement -- --
2 Collaboration or Joint Development Agreement -- --
3 Collaboration or Joint Development Agreement -- --
4 Collaboration or Joint Development Agreement -- --
5 Consent details of actual owner of Land -- --
6 Land Title Deed(s) - In case land is not owned by Promoter -- --
7 Land Title Search Report -- --
8 Latest Jamabandi Document -- --
9 Legal Title Deed(s) - In case Land is owned by Promoter -- --
10 Non Encumbrance Certificate -- --
11 Project Land Khasra Report or Plan -- --
Project Brochure/ Prospectus Documents
Sr.No Document Name View Details
1 Advertisement and Brochure/ Prospectus

Type of Project (Nirwana Heights)
1 Commercial ( Building/Tower Development )
2 Residential ( Building/Tower Development )
Project Building/ Tower/ Block Construction & Inventory Details
Sr.No Building/Tower/Block Name Number of Floor/Plots related to Building/ Tower/ Block
1 BLOCK A1 Number of Floor/Plots Currently Sanctioned: 15
Number of Floor/Plots Proposed: 15
Number of Floors Constructed: 0
Sr.No Type of Apartment/ Shop/ Plot Total Number of Apartment/ Shop/ Plot Number of Apartment/ Shop/ Plot already sold Carpet Area of Apartment/ Shop/ Plot Exclusive OpenTerrace Area Area of the Exclusive Balcony/Verandah
1 Flats + Duplex Skyvillas 32 0 2818.2 (in sqr mtrs) 0 (in sqr mtrs) 0 (in sqr mtrs)
2 BLOCK A2 Number of Floor/Plots Currently Sanctioned: 15
Number of Floor/Plots Proposed: 15
Number of Floors Constructed: 0
Sr.No Type of Apartment/ Shop/ Plot Total Number of Apartment/ Shop/ Plot Number of Apartment/ Shop/ Plot already sold Carpet Area of Apartment/ Shop/ Plot Exclusive OpenTerrace Area Area of the Exclusive Balcony/Verandah
1 Flats + Duplex Skyvillas 31 0 2789.31 (in sqr mtrs) 0 (in sqr mtrs) 0 (in sqr mtrs)
3 BLOCK A3 Number of Floor/Plots Currently Sanctioned: 15
Number of Floor/Plots Proposed: 15
Number of Floors Constructed: 0
Sr.No Type of Apartment/ Shop/ Plot Total Number of Apartment/ Shop/ Plot Number of Apartment/ Shop/ Plot already sold Carpet Area of Apartment/ Shop/ Plot Exclusive OpenTerrace Area Area of the Exclusive Balcony/Verandah
1 Flats + Duplex Skyvillas 31 0 2844.25 (in sqr mtrs) 0 (in sqr mtrs) 0 (in sqr mtrs)
4 BLOCK A4 Number of Floor/Plots Currently Sanctioned: 15
Number of Floor/Plots Proposed: 15
Number of Floors Constructed: 0
Sr.No Type of Apartment/ Shop/ Plot Total Number of Apartment/ Shop/ Plot Number of Apartment/ Shop/ Plot already sold Carpet Area of Apartment/ Shop/ Plot Exclusive OpenTerrace Area Area of the Exclusive Balcony/Verandah
1 Flats + Duplex Skyvillas 31 0 2844.25 (in sqr mtrs) 0 (in sqr mtrs) 0 (in sqr mtrs)
5 BLOCK A5 Number of Floor/Plots Currently Sanctioned: 15
Number of Floor/Plots Proposed: 15
Number of Floors Constructed: 0
Sr.No Type of Apartment/ Shop/ Plot Total Number of Apartment/ Shop/ Plot Number of Apartment/ Shop/ Plot already sold Carpet Area of Apartment/ Shop/ Plot Exclusive OpenTerrace Area Area of the Exclusive Balcony/Verandah
1 Flats + Duplex Skyvillas 31 0 2844.25 (in sqr mtrs) 0 (in sqr mtrs) 0 (in sqr mtrs)
6 BLOCK A6 Number of Floor/Plots Currently Sanctioned: 15
Number of Floor/Plots Proposed: 15
Number of Floors Constructed: 0
Sr.No Type of Apartment/ Shop/ Plot Total Number of Apartment/ Shop/ Plot Number of Apartment/ Shop/ Plot already sold Carpet Area of Apartment/ Shop/ Plot Exclusive OpenTerrace Area Area of the Exclusive Balcony/Verandah
1 Flats + Duplex Skyvillas 31 0 2789.31 (in sqr mtrs) 0 (in sqr mtrs) 0 (in sqr mtrs)
7 BLOCK A7 Number of Floor/Plots Currently Sanctioned: 15
Number of Floor/Plots Proposed: 15
Number of Floors Constructed: 0
Sr.No Type of Apartment/ Shop/ Plot Total Number of Apartment/ Shop/ Plot Number of Apartment/ Shop/ Plot already sold Carpet Area of Apartment/ Shop/ Plot Exclusive OpenTerrace Area Area of the Exclusive Balcony/Verandah
1 Flats + Duplex Skyvillas 32 0 2818.2 (in sqr mtrs) 0 (in sqr mtrs) 0 (in sqr mtrs)
8 BLOCK B1 Number of Floor/Plots Currently Sanctioned: 15
Number of Floor/Plots Proposed: 15
Number of Floors Constructed: 0
Sr.No Type of Apartment/ Shop/ Plot Total Number of Apartment/ Shop/ Plot Number of Apartment/ Shop/ Plot already sold Carpet Area of Apartment/ Shop/ Plot Exclusive OpenTerrace Area Area of the Exclusive Balcony/Verandah
1 Flats 56 0 3778.32 (in sqr mtrs) 0 (in sqr mtrs) 0 (in sqr mtrs)
9 BLOCK B2 Number of Floor/Plots Currently Sanctioned: 15
Number of Floor/Plots Proposed: 15
Number of Floors Constructed: 0
Sr.No Type of Apartment/ Shop/ Plot Total Number of Apartment/ Shop/ Plot Number of Apartment/ Shop/ Plot already sold Carpet Area of Apartment/ Shop/ Plot Exclusive OpenTerrace Area Area of the Exclusive Balcony/Verandah
1 Flats 56 0 3778.32 (in sqr mtrs) 0 (in sqr mtrs) 0 (in sqr mtrs)
10 BLOCK B3 Number of Floor/Plots Currently Sanctioned: 15
Number of Floor/Plots Proposed: 15
Number of Floors Constructed: 0
Sr.No Type of Apartment/ Shop/ Plot Total Number of Apartment/ Shop/ Plot Number of Apartment/ Shop/ Plot already sold Carpet Area of Apartment/ Shop/ Plot Exclusive OpenTerrace Area Area of the Exclusive Balcony/Verandah
1 Flats 56 0 3778.32 (in sqr mtrs) 0 (in sqr mtrs) 0 (in sqr mtrs)
11 BLOCK C1 Number of Floor/Plots Currently Sanctioned: 7
Number of Floor/Plots Proposed: 7
Number of Floors Constructed: 0
Sr.No Type of Apartment/ Shop/ Plot Total Number of Apartment/ Shop/ Plot Number of Apartment/ Shop/ Plot already sold Carpet Area of Apartment/ Shop/ Plot Exclusive OpenTerrace Area Area of the Exclusive Balcony/Verandah
1 Flats 12 0 1076.16 (in sqr mtrs) 0 (in sqr mtrs) 0 (in sqr mtrs)
12 BLOCK C2 Number of Floor/Plots Currently Sanctioned: 7
Number of Floor/Plots Proposed: 7
Number of Floors Constructed: 0
Sr.No Type of Apartment/ Shop/ Plot Total Number of Apartment/ Shop/ Plot Number of Apartment/ Shop/ Plot already sold Carpet Area of Apartment/ Shop/ Plot Exclusive OpenTerrace Area Area of the Exclusive Balcony/Verandah
1 Flats 12 0 1076.16 (in sqr mtrs) 0 (in sqr mtrs) 0 (in sqr mtrs)
13 BLOCK C3 Number of Floor/Plots Currently Sanctioned: 7
Number of Floor/Plots Proposed: 7
Number of Floors Constructed: 0
Sr.No Type of Apartment/ Shop/ Plot Total Number of Apartment/ Shop/ Plot Number of Apartment/ Shop/ Plot already sold Carpet Area of Apartment/ Shop/ Plot Exclusive OpenTerrace Area Area of the Exclusive Balcony/Verandah
1 Flats 12 0 1076.16 (in sqr mtrs) 0 (in sqr mtrs) 0 (in sqr mtrs)
14 BLOCK C4 Number of Floor/Plots Currently Sanctioned: 7
Number of Floor/Plots Proposed: 7
Number of Floors Constructed: 0
Sr.No Type of Apartment/ Shop/ Plot Total Number of Apartment/ Shop/ Plot Number of Apartment/ Shop/ Plot already sold Carpet Area of Apartment/ Shop/ Plot Exclusive OpenTerrace Area Area of the Exclusive Balcony/Verandah
1 Flats 12 0 1076.16 (in sqr mtrs) 0 (in sqr mtrs) 0 (in sqr mtrs)
15 BLOCK C5 Number of Floor/Plots Currently Sanctioned: 7
Number of Floor/Plots Proposed: 7
Number of Floors Constructed: 0
Sr.No Type of Apartment/ Shop/ Plot Total Number of Apartment/ Shop/ Plot Number of Apartment/ Shop/ Plot already sold Carpet Area of Apartment/ Shop/ Plot Exclusive OpenTerrace Area Area of the Exclusive Balcony/Verandah
1 Flats 12 0 1076.16 (in sqr mtrs) 0 (in sqr mtrs) 0 (in sqr mtrs)
16 BLOCK D Number of Floor/Plots Currently Sanctioned: 10
Number of Floor/Plots Proposed: 10
Number of Floors Constructed: 0
Sr.No Type of Apartment/ Shop/ Plot Total Number of Apartment/ Shop/ Plot Number of Apartment/ Shop/ Plot already sold Carpet Area of Apartment/ Shop/ Plot Exclusive OpenTerrace Area Area of the Exclusive Balcony/Verandah
1 Flats 45 0 1471.95 (in sqr mtrs) 0 (in sqr mtrs) 0 (in sqr mtrs)
17 BLOCK E Number of Floor/Plots Currently Sanctioned: 2
Number of Floor/Plots Proposed: 2
Number of Floors Constructed: 0
Sr.No Type of Apartment/ Shop/ Plot Total Number of Apartment/ Shop/ Plot Number of Apartment/ Shop/ Plot already sold Carpet Area of Apartment/ Shop/ Plot Exclusive OpenTerrace Area Area of the Exclusive Balcony/Verandah
1 Clubhouse 1 0 391.63 (in sqr mtrs) 0 (in sqr mtrs) 0 (in sqr mtrs)
18 BLOCK F Number of Floor/Plots Currently Sanctioned: 1
Number of Floor/Plots Proposed: 1
Number of Floors Constructed: 0
Sr.No Type of Apartment/ Shop/ Plot Total Number of Apartment/ Shop/ Plot Number of Apartment/ Shop/ Plot already sold Carpet Area of Apartment/ Shop/ Plot Exclusive OpenTerrace Area Area of the Exclusive Balcony/Verandah
1 Shop 17 0 551.31 (in sqr mtrs) 0 (in sqr mtrs) 0 (in sqr mtrs)
Parking Details
Sr.No Type of Parking Total Area of Parking Space Total Number of Parking Space No of Parking Space Booked or Sold
1 Open 11347 (in sqr Mtrs) 512 0
2 Stilt 7531 (in sqr Mtrs) 277 0
Internal Infrastructure and Facilities Details
Sr.No Internal Infrastructure Facilities Name Internal Infrastructure Facilities Details Work Progress % Percentage
1 Fire Fighting Fire Fighting System 0.00
2 Drinking Water Borewell Water 0.00
3 Emergency Evacuation Emergency Exit Points 0.00
4 Rain Water Harvesting Rain Water Harvesting System 0.00
5 Park Green Park and Kids Play Area 0.00
6 CCTV Cameras CCTV Cameras 0.00
7 Manpower Security Entry Gates Manpower Security Entry Gates 0.00
8 Street Lighting Street Lighting 0.00
9 Club House Clubhouse 0.00
External Infrastructure and Facilities Details
Sr.No External Infrastructure Facilities Name Facilities Type External Infrastructure Facilities Details Work Progress %age
1 Stilt Parking Self-Development Stilt Parking 0.00
2 External Roads and Road System Landscaping Self-Development External Roads inside the complex boundary 0.00
3 Water Supply System Self-Development Borewell Water Supply 0.00
4 Sewerage and Drainage System Self-Development Self Development inside complex boundary and outside complex boundary to be done by MC Kharar 0.00
5 Electricity Supply Transformer and Sub Station Self-Development Electrical Transformer Setup, Substation not required 0.00
6 Solid Waste Management and Disposal External Development Work (MC Kharar) Solid Waste Management to be done by MC Kharar 0.00

Project Professionals (Real Estate Agents, Structural Engineer, Architect, Contractors and other person)
Sr.No Name of Professional Associated Consultant Type Name & Year of Establishment of Promoter Name & Profile of Key Projects Completed
1 UMESH SHARMA Architect
The Design Studio Established in 2009 Nirwana Greens Nirwana Greens 2 Nirwana Greens 4 Amari Greens Nature Huts 2
Address for Official Communication SCO 230-231, 3rd Floor, , Sector 34-A
Chandigarh , Chandigarh - 160022
Email: umeshchd[at]gmail.com Mobile/Landline Number: 9872008372

Quarterly Updates of Registered Project
Sr.No. Quarter Name Quarter Year Reference Number Reference Date View Details
1 QTR-III (July-September) 2021 QUP2021T20212453 06-Dec-2021
2 QTR-II (April-June) 2021 QUP2021S20212454 06-Dec-2021
3 QTR-IV (October-December) 2021 QUP2021L20220531 27-Feb-2022
4 QTR-I (January-March) 2022 QUP2022F20220795 11-Apr-2022
5 QTR-II (April-June) 2022 QUP2022S20221475 10-Jul-2022
6 QTR-III (July-September) 2022 QUP2022T20222239 05-Nov-2022
7 QTR-IV (October-December) 2022 QUP2022L20230106 10-Jan-2023
8 QTR-I (January-March) 2023 QUP2023F20231386 09-Apr-2023
9 QTR-II (April-June) 2023 QUP2023S20232771 07-Jul-2023
10 QTR-III (July-September) 2023 QUP2023T20233817 05-Oct-2023
11 QTR-IV (October-December) 2023 QUP2023L20240325 22-Jan-2024
12 QTR-I (January-March) 2024 QUP2024F20240848 03-Apr-2024
13 QTR-II (April-June) 2024 QUP2024S20241592 02-Jul-2024
14 QTR-III (July-September) 2024 QUP2024T20242396 03-Oct-2024
15 QTR-IV (October-December) 2024 QUP2024L20250084 06-Jan-2025
16 QTR-I (January-March) 2025 QUP2025F20250983 03-Apr-2025